Planning, design, setting up and use of temporary suspended access equipment. Code of practice Ingestion-build-96603 Structure of healthcare CPs and
$161.00
Description
Structure of healthcare CPs and healthcare CPSs
BS EN 755-4:2008 supersedes BS EN 755-4:1995
as not all four point strap-type tie-downs are suitable for test in accordance with the requirements of this PAS
Industries with the explosive work atmosphere
the location
Planning, design, setting up and use of temporary suspended access equipment. Code of practice Ingestion-build-96603 Structure of healthcare CPs andWhat is this standard about? Temporary suspended access equipment (TSAE) supports or contains people working at height. Typically it is a temporary suspended platform (TSP), work cage or chair; suspended from a suspension rig; assembled at the place of work; used to carry out specific tasks; and then dismantled and removed when the specific tasks are completed to be used elsewhere. This standard provides recommendations on choosing and using this type
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.