Free-standing industrial chimneys - Design and execution of mast construction with satellite components Ingestion-build-95349 Annex A (informative) Additional information
$166.00
Description
Annex A (informative) Additional information to conduct tests according to test method A
BS EN 61236 has been prepared in accordance with the requirements of IEC 61477
DC spark over-voltage and Impulse sparkover voltage are useful in measuring the values of GDT
Changes to the 2007 standard include:
Figure 1 and the correspondent explanations updated
Free-standing industrial chimneys - Design and execution of mast construction with satellite components Ingestion-build-95349 Annex A (informative) Additional information
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 348.50
US$ 320.00
US$ 1070.50
US$ 1109.50